A practical seven-step roadmap for small and medium-sized plants: asset register, criticality, failure recording, preventive routes, condition monitoring, KPIs and, finally, prediction.

Most small and medium-sized plants do not choose reactive maintenance; they drift into it. A line runs, a motor fails, the team repairs it, and the next fire starts before anyone has time to ask why the first one happened. Predictive maintenance is often presented as the cure, but jumping straight to sensors and dashboards rarely works. This guide sets out a practical, step-by-step roadmap that a plant with a small maintenance team can follow.

First, agree on the vocabulary

The European standard EN 13306 (maintenance terminology) gives a useful common language:

  • Corrective maintenance is carried out after a fault has been recognised, to restore an item to a state in which it can perform its function. It can be immediate or deferred.
  • Preventive maintenance is carried out to reduce the probability of failure. It can be predetermined (at fixed intervals or after a number of operating hours or cycles) or condition-based (triggered by the monitored condition of the item).
  • Predictive maintenance is condition-based maintenance carried out following a forecast derived from analysis and evaluation of the condition of the item.

Predictive maintenance is therefore not a separate world: it is the most data-driven form of preventive maintenance. Every plant needs a sensible mix of all three, and reactive repair remains the right choice for cheap, non-critical items whose failure has little consequence.

Step 1: Know what you have (asset register)

You cannot prioritise what you have not listed. Build a simple asset register with, at minimum:

  • a unique tag for each asset and its location in the process;
  • manufacturer, model, year and key ratings (power, speed, pressure);
  • the documents you have (manuals, drawings, spare parts lists).

A spreadsheet is fine to start. Aim for completeness on the production lines first, then utilities (compressors, boilers, chillers, pumps).

Step 2: Rank assets by criticality

Not every machine deserves the same attention. For each asset, score in a few minutes with the production and safety people:

  1. Consequence of failure: safety, environment, lost production, quality, repair cost.
  2. Likelihood of failure: history, age, operating conditions.
  3. Redundancy: is there a standby unit or a bypass?

Multiply or combine the scores into three classes (for example A, B, C). Class A assets are where predictive techniques usually pay off first; class C items can often run to failure on purpose.

Step 3: Start recording failures and work

Reliable decisions need history. From day one, record every intervention: date, asset, symptom, cause (if known), action, downtime, parts and hours. Use a short, fixed list of failure codes so that records can be counted later. Paper forms are acceptable for a few months, but plan to move to a CMMS, because spreadsheets become hard to analyse once several people write in them.

Step 4: Build a basic preventive plan

For class A and B assets, write down the tasks that already make sense from manufacturers' manuals and experience: lubrication, belt and filter checks, tightening, cleaning, visual inspections. Group tasks into routes by frequency (daily, weekly, monthly, annual) so that technicians can follow them. Keep the plan lean; a plan that is not executed is worse than a short plan that is.

Step 5: Add condition monitoring where it pays off

Choose techniques based on the failure modes of your critical assets, not on what is fashionable:

  • Vibration analysis for rotating machines (motors, pumps, fans, gearboxes); severity can be judged against ISO 10816 / ISO 20816.
  • Infrared thermography for electrical panels, connections and bearings.
  • Oil analysis for gearboxes, hydraulics and large engines.
  • Ultrasound for compressed-air leaks, steam traps and early bearing lubrication problems.
  • Motor current and electrical tests for motors and drives.

Start with periodic measurement routes (for example monthly) on class A assets. Permanent online sensors make sense where failures develop quickly, where access is difficult or unsafe, or where the cost of a stoppage is very high.

Step 6: Measure progress with a few KPIs

Choose three to five indicators and track them monthly. Good starting points are unplanned downtime hours, MTBF and MTTR on critical assets, and the share of planned versus total maintenance hours. The European standard EN 15341 provides a structured set of maintenance KPIs if you want to go further. Review them in a short monthly meeting and decide one or two actions each time.

Step 7: Move to prediction when the basics are stable

When you have a few months of clean history, reliable condition data on critical assets and a team that follows its routes, you can consider trend-based alarms and, later, machine-learning models that estimate remaining useful life. Without the first six steps, such models usually have too little good data to be trusted.

Common pitfalls

  • Buying sensors before defining what decisions they will support. Every measurement should be tied to a failure mode and an action.
  • Trying to cover every asset at once. Start with a pilot on a handful of class A machines and expand.
  • Ignoring people. Technicians and operators need time and training to adopt new routines; involve them in choosing the checks.
  • No feedback loop. If findings from inspections are not turned into work orders and then closed, the programme loses credibility quickly.

A realistic first 90 days

WeeksFocusOutput
1–3Asset register and criticalityRanked list of assets
4–6Failure recording and basic PM routesForms or CMMS entries, route sheets
7–10Condition monitoring pilot on 3–5 class A assetsBaseline measurements
11–13First KPI reviewAgreed targets and next actions

How the cluster can help

The Maintenance Cluster covers, with its members, the whole path described here: maintenance needs diagnosis and consulting, sensor installation and integration, condition monitoring and predictive maintenance, CMMS and spare parts management, and on-site maintenance works. If you are unsure where your plant stands or which step to take next, describe your situation in the intake wizard and the cluster team will propose the solution that fits.