Maintenance key performance indicators (KPIs) help a plant see whether its equipment is becoming more reliable and whether maintenance effort is going to the right places. The problem is that the same abbreviation can be calculated in different ways, and numbers that are not defined clearly lead to arguments instead of decisions. This article explains four of the most common indicators in plain words, with formulas and small worked examples.

For formal definitions, two European standards are useful references: EN 13306 for maintenance terminology and EN 15341 for maintenance KPIs, which provides a structured set of indicators covering economic, technical and organisational aspects. OEE is defined for manufacturing operations in ISO 22400-2.

MTBF: mean time between failures

What it tells you: how long, on average, an item runs between failures. A rising MTBF means the equipment is becoming more reliable.

Formula:

MTBF = total operating time ÷ number of failures

Operating time is the time the item was actually running (or available to run), excluding the time it was down for repair. Count only failures that stopped or impaired the function, and agree in advance whether short stops count.

Example: a packaging machine is scheduled for 500 hours in a month. It fails 5 times, and the repairs take 10 hours in total.

  • Operating time = 500 − 10 = 490 h
  • MTBF = 490 ÷ 5 = 98 h

Watch out: MTBF on a single machine over one month is statistically weak; look at trends over several months, or at groups of similar machines.

MTTR: mean time to repair (or to restoration)

What it tells you: how long, on average, it takes to get the item working again after a failure. A falling MTTR means faster diagnosis, better access to parts and better-prepared teams.

Formula:

MTTR = total repair (restoration) time ÷ number of repairs

Example (same machine):

  • MTTR = 10 h ÷ 5 = 2 h

Watch out: decide what the clock includes. Some plants measure only hands-on repair time; others measure from the moment of failure until production restarts, including waiting for a technician or a part. EN 13306 distinguishes these time elements. The second definition is usually more useful for management because it shows logistic delays too, but whichever you choose, keep it consistent.

Availability from MTBF and MTTR

The two indicators combine into a simple availability figure:

Availability = MTBF ÷ (MTBF + MTTR)

Example: 98 ÷ (98 + 2) = 98 %. This matches the direct calculation 490 h ÷ 500 h. Note that this figure considers only failures; planned stops, changeovers and lack of material are treated separately.

OEE: overall equipment effectiveness

What it tells you: how much of the planned production time results in good product at the ideal speed. OEE comes from Total Productive Maintenance (TPM) and combines three losses:

OEE = Availability × Performance × Quality

where:

  • Availability = run time ÷ planned production time
  • Performance = (ideal cycle time × total count) ÷ run time
  • Quality = good count ÷ total count

Example: one 8-hour shift on a line.

ItemValue
Planned production time480 min
Stops (breakdowns, changeover)48 min
Run time432 min
Ideal cycle time1.0 min per part
Total parts produced380
Good parts361
  • Availability = 432 ÷ 480 = 90.0 %
  • Performance = (1.0 × 380) ÷ 432 = 88.0 %
  • Quality = 361 ÷ 380 = 95.0 %
  • OEE = 0.900 × 0.880 × 0.950 ≈ 75.2 %

A useful check: good parts × ideal cycle time ÷ planned time = 361 ÷ 480 ≈ 75.2 %. The two results must agree.

Watch out:

  • The ideal cycle time must be the true design or best demonstrated rate, not a relaxed standard; otherwise performance can exceed 100 %.
  • OEE is not a pure maintenance indicator. Changeovers, material shortages and quality problems also reduce it. Use it to find the biggest loss, then assign actions to the right team.
  • Comparing OEE between different plants or products is risky because definitions of planned time differ. Use it mainly to track your own trend.

Planned maintenance percentage

What it tells you: how much of the maintenance work is planned in advance rather than done in reaction to failures. Planned work is generally safer, faster and cheaper because parts, tools and permits are prepared.

Formula (one common form):

Planned maintenance % = planned maintenance hours ÷ total maintenance hours × 100

The key question is what counts as "planned". Two common definitions:

  1. Preventive and predictive work only (scheduled inspections, servicing, condition-based tasks).
  2. All work that was planned before execution, including corrective work identified by inspections and done at a scheduled time.

Example: in one month the team logs 400 maintenance hours:

Type of workHours
Preventive (scheduled)180
Condition-based / predictive40
Corrective, planned in advance80
Corrective, emergency100
Total400
  • Definition 1: (180 + 40) ÷ 400 = 55 %
  • Definition 2: (180 + 40 + 80) ÷ 400 = 75 %

Same plant, same month, two very different numbers. Write your definition down and keep it.

Making KPIs useful

  • Start small. Three to five indicators reviewed every month are better than twenty that nobody reads.
  • Define each one on one page: purpose, formula, data source, owner, frequency.
  • Pair indicators. For example, watch MTBF together with planned maintenance percentage: more planned work should, over time, show up as fewer failures.
  • Set targets from your own baseline, and improve step by step. External benchmarks can inspire, but only if definitions match.
  • Turn numbers into actions. Each review should end with a short list of decisions and owners.
  • Get the data right. KPIs depend on clean work order data: correct asset, failure codes, start and end times. A CMMS makes this much easier.

How the cluster can help

The Maintenance Cluster offers, through its members, maintenance consulting to define KPIs and review processes, maintenance needs diagnosis, CMMS implementation so that the data behind the indicators is reliable, and condition monitoring and predictive maintenance services to improve the results. If you want to set up or improve maintenance KPIs, describe your situation in the intake wizard and the cluster team will suggest suitable support.

Σύμβουλος Συντήρησης